IPH accredited to IEC 62475

04.05.2012

Since April 2012 IPH has been accredited to carry out calibration to this standard. See also the new calibration brochure in our Download.

Read more All News

 

  

HS-Halle2 1960 HS-Halle1 heute Halbleiterprüfstand1970 Gleichrichtermodul für GS-Prüfungen heute

 

                 Technical Development

2009

Installation of  new transient recorder measuring system

2008

Acquisition of 3rd IPH on-site AC HV test system

2007

New pressure-withstand proved testing cubicle for internal arcing tests
Extended testing capacities at LV test laboratory after commissioning of 2 new test bays providing short-circuit currents and network follow currents up to 100 kA

2005

IPH high-current shunt becomes high-current normal in all STL test laboratories
Test of the longest 400-kV cable system worldwide in London using IPH on-site AC HV test systems

2004

Acquisition of 2nd IPH on-site AC HV test system

2003

Development of new generation of Rogowski measuring systems entwickelt
Extended DC testing capacity due to new diode rectifier

2002

Commissioning of 400-kV network power supply as the most powerful network test laboratory in  Europe
Commissioning of 8/20µs surge generator for tests on overvoltage arresters with currents up to 100 kA

2001

Commissioning of new „VDE test bays“ for switchgear and installation and protection equipment at LV test laboratory and for  PVC wires in the HV test laboratory

2000

Commissioning of 400-kV overheal line

1999

Commissioning of new HV test laboratory and of outdoor HV test installation equipped with 480-kV test transformer

1998

1st test using IPH on-site AC HV test system on 400-kV cable system of BEWAG (Berlin utility) , new capacitor test installation at HP test laboratory, new long-term test bay at HV test laboratory

1985/86

Network investigations within major electrical projects, use of modern transient recorder equipment

1982

Start of consulting activities on international scale

1980

Synthetic test installation extended, thermograph laboratory built

1979

Start of network testing and special testing activities

1975

Contact laboratory built

1965

Synthetic test installation built, 2200-MVA power supply by generator

1960

Commissioning of  IPH test current supply by 220-kV overhead line, Commissioning of 20 test laboratories, 600-kV network power supply, 1200-MVA power supply by generator

1957

Commissioning of IPH test current supply by 110-kV overhead line

1956

1st IPH test vehicle, test laboratory snd 220-kV substation built, pilot network test bay

   