► Download Brochures
► Download of IPH-Report Newsletter
|
Main Topics |
| Report No. 22 (2011) |
•Testing the commutation switching capacity of switchgear applied for HVDC transmission |
| IPH-Report No. 21 (2011) |
•Assurance of quality in cable systems
•Commissioning tests on cable systems
•Short-time PD monitoring |
| IPH-Report No. 20 (2010) |
•IPH accreditation by Russian Federal Railway Agency
•Testing services in the field of railway technology
•IPH provides STL high-current reference shunt |
| IPH-Report No. 19 (2009) |
•IEC 61439 - Design Verification at IPH
•New measuring equipment for high-current calibration |
| IPH-Report 2008 |
•Third IPH on-site AC HV test system
•Low-voltage testing capacity extended |
| IPH-Report 2007 |
•New pressure-withstand-proved testing cubicle at IPH
•IEC 62271-202 - new standard for HV/LV prefabricated substations
|
| IPH-Report 1/2006 |
•50th anniversary of IPH |
| IPH-Report 2/2006 |
•IPH expanding on-site services
•Papers on on-site measurement |
| IPH-Report 1/2005 |
•IPH as a service provider
•IPH becomes ASTA test laboratory |
| IPH-Report 2/2005 |
•IPH integrated in CESI Group
•IPH carries out the world's larges commissioning test on 20-km 400-kV cable system |
|
 |
|
 |
|
 |